HomeCompareBrainner vs Lever

Side-by-side · Rubric v1.0

Brainner vs Lever

Export comparison (CSV)Pro→

§ The result

Lever leads Brainner on 3 of the 7 criteria.

Lever (ATS-integrated) edges Brainner (Screening) by 3 points under rubric v1.0, 49 to 46. Lever leads 3 of the 7 criteria and the remaining 4 are level, so Brainner is ahead on none of them; the closest of the 3 Lever leads is FRIA Support, Brainner 30 to Lever 32. One criterion, Human Oversight Design, is both the widest raw gap (Brainner 50, Lever 60) and the heaviest weighted swing, and at 12% weight it makes up 53% of the weighted advantage Lever holds across the 3 criteria it leads.

§ The record

Brainner is filed under Screening AI, Lever under ATS-integrated AI. They also share 1 secondary category: Sourcing.

Both are in scope of EU AI Act, NYC LL 144, Colorado AI Act and Illinois HB 3773.

RecordBrainnerLever
Price tierLowMid
HeadquartersUSUS
Founded20232012

§ What decides it

The criteria that move the gap, heaviest swing first.

  1. 12% weight · 53% of the movement so far

    Human Oversight Design

    Brainner 50 · Lever 60

    1.2 weighted points to Lever

  2. 15% weight · 87% of the movement so far

    Data Governance Disclosure

    Brainner 53 · Lever 58

    0.8 weighted points to Lever

  3. 15% weight · 100% of the movement so far

    FRIA Support

    Brainner 30 · Lever 32

    0.3 weighted points to Lever

Weighted delta is the raw difference times the criterion weight, so the 3 figures above sum to -2.3 — the difference between the two totals before either is rounded. Shares are of 2.3 points of movement counted without direction. The table below rounds each side to a whole number first, so its Δ raw total reads -3 beside that -2.3.

§ Category-by-category

Raw score per criterion, with weighted delta.

Δ is Brainner minus Lever.

CategoryWeightBrainnerLeverΔ rawΔ weighted
Article 11 Technical Documentation20%5252--
Bias Audit Transparency18%4242--
FRIA Support15%3032-2-0.3
Data Governance Disclosure15%5358-5-0.8
Human Oversight Design12%5060-10-1.2
Post-Market Monitoring12%4545--
Customer Documentation8%5858--
Total100%46 (F)49 (F)-3-2.3

§ Evidence

Cited sources and documented absences, criterion by criterion.

An absence is a finding, not a blank: the reviewer looked for a named artefact and recorded that it is not located. Where a source sits is a fact about hosting only.

CriterionWeightBrainnerLever
CitedAbsencesAudit / hostingCitedAbsencesAudit / hosting
Article 11 Technical Documentation20%41Sources on the vendor's own domain21Sources on a separate domain
Bias Audit Transparency18%60Sources on the vendor's own domainSources on a separate domain21Sources on a separate domain
FRIA Support15%31Sources on the vendor's own domain11Sources on a separate domain
Data Governance Disclosure15%60Sources on the vendor's own domain21Sources on the vendor's own domain
Human Oversight Design12%60Sources on the vendor's own domain20Sources on the vendor's own domain
Post-Market Monitoring12%41Sources on the vendor's own domain21Sources on the vendor's own domain
Customer Documentation8%41Sources on the vendor's own domain21Sources on the vendor's own domainSources on a separate domain
All criteria100%334Sources on the vendor's own domainSources on a separate domain136Sources on the vendor's own domainSources on a separate domain

Brainner has 37 evidence rows across 7 of 7 criteria — 33 with a source URL, 4 documented absences; Lever has 19 evidence rows across 7 of 7 criteria — 13 with a source URL, 6 documented absences; some documentation or audit rows for Brainner and Lever sit on a domain separate from the vendor's own site.

Provenance

The scores above are documented by 56 evidence rows on file for these two vendors: 37 for Brainner, across 2 distinct source domains, and 19 for Lever, across 2 distinct source domains.

Rubric
v1.0
Brainner last reviewed
September 25, 2026 · HireAIScore editorial team
Lever last reviewed
June 7, 2026 · HireAIScore editorial team

HireAIScore scores are editorial research, not legal advice, and no vendor pays for placement, scoring or removal — see the methodology, conflicts policy and terms.