HomeCompareFountain vs SHL

Side-by-side · Rubric v1.0

Fountain vs SHL

Export comparison (CSV)Pro

§ The result

SHL leads Fountain on 4 of the 7 criteria.

SHL scores 51 and Fountain 44 under rubric v1.0, a 7-point gap across the Assessment and Screening cohorts. SHL leads 4 of the 7 criteria and the remaining 3 are level, so Fountain is ahead on none of them; the closest of the 4 SHL leads is Data Governance Disclosure, Fountain 55 to SHL 58. Bias Audit Transparency is both the widest raw gap and the heaviest weighted swing — Fountain 30, SHL 50 — and at an 18% weight it carries 54% of the weighted advantage SHL holds across the 4 criteria on that side of the table.

§ The record

Fountain is filed under Screening AI, SHL under Assessment AI. They record no secondary category in common.

Both are in scope of EU AI Act, NYC LL 144, Colorado AI Act and Illinois HB 3773. Only SHL is in scope of Mobley v. Workday.

RecordFountainSHL
Price tierEnterpriseEnterprise
HeadquartersUSGB
Founded20141977

§ What decides it

The criteria that move the gap, heaviest swing first.

  1. 18% weight · 54% of the movement so far

    Bias Audit Transparency

    Fountain 30 · SHL 50

    3.6 weighted points to SHL

  2. 20% weight · 84% of the movement so far

    Article 11 Technical Documentation

    Fountain 50 · SHL 60

    2.0 weighted points to SHL

  3. 8% weight · 93% of the movement so far

    Customer Documentation

    Fountain 52 · SHL 60

    0.6 weighted points to SHL

  4. 15% weight · 100% of the movement so far

    Data Governance Disclosure

    Fountain 55 · SHL 58

    0.4 weighted points to SHL

Weighted delta is the raw difference times the criterion weight, so the 4 figures above sum to -6.7 — the difference between the two totals before either is rounded. Shares are of 6.7 points of movement counted without direction. The table below rounds each side to a whole number first, so its Δ raw total reads -7 beside that -6.7.

§ Category-by-category

Raw score per criterion, with weighted delta.

Δ is Fountain minus SHL.

CategoryWeightFountainSHLΔ rawΔ weighted
Article 11 Technical Documentation20%5060-10-2.0
Bias Audit Transparency18%3050-20-3.6
FRIA Support15%3030--
Data Governance Disclosure15%5558-3-0.4
Human Oversight Design12%5858--
Post-Market Monitoring12%4040--
Customer Documentation8%5260-8-0.6
Total100%44 (F)51 (F)-7-6.7

§ Evidence

Cited sources and documented absences, criterion by criterion.

An absence is a finding, not a blank: the reviewer looked for a named artefact and recorded that it is not located. Where a source sits is a fact about hosting only.

CriterionWeightFountainSHL
CitedAbsencesAudit / hostingCitedAbsencesAudit / hosting
Article 11 Technical Documentation20%21Sources on the vendor's own domain21Sources on the vendor's own domain
Bias Audit Transparency18%2121Sources on the vendor's own domain
FRIA Support15%11Sources on the vendor's own domain11Sources on the vendor's own domain
Data Governance Disclosure15%21Sources on the vendor's own domain30Sources on the vendor's own domain
Human Oversight Design12%30Sources on the vendor's own domain20Sources on the vendor's own domain
Post-Market Monitoring12%21Sources on the vendor's own domain21Sources on the vendor's own domain
Customer Documentation8%21Sources on the vendor's own domain30Sources on the vendor's own domain
All criteria100%146Sources on the vendor's own domain154Sources on the vendor's own domain

Fountain has 20 evidence rows across 7 of 7 criteria — 14 with a source URL, 6 documented absences; SHL has 19 evidence rows across 7 of 7 criteria — 15 with a source URL, 4 documented absences.

Provenance

The scores above are documented by 39 evidence rows on file for these two vendors: 20 for Fountain, across 2 distinct source domains, and 19 for SHL, across 1 distinct source domain.

Rubric
v1.0
Fountain last reviewed
June 7, 2026 · HireAIScore editorial team
SHL last reviewed
June 7, 2026 · HireAIScore editorial team

HireAIScore scores are editorial research, not legal advice, and no vendor pays for placement, scoring or removal — see the methodology, conflicts policy and terms.